Write down the failure that would end the company, then build the rig for that one first.
Two field failures, no injuries, product withdrawn for five weeks
Samuel Adeyemi
@samuel-packs
Written by someone who worked on it.
Six months of drop testing on a battery pack that had never failed by being dropped. It failed by being charged in a hot van, which nobody had a rig for.
Problem
The test plan was inherited from a consumer electronics template. It was thorough about drops and vibration and silent about charging at 48 °C, which is the ordinary condition for a pack that lives in a delivery van.
Context
A swappable battery pack for delivery motorcycles. Eight-person team, 600 packs in the field, charging infrastructure owned by the customer.
What they did
- Listed the three failures that would end the company and ranked the test plan against that list rather than against a standard.
- Built a thermal chamber from a chest freezer and a heat gun for under 400 USD.
- Reproduced the field failure in nine days once the rig existed.
- Added an ambient cutoff in firmware and shipped it to the fleet before restarting sales.
What to avoid
- The inherited test plan was comprehensive enough to feel like diligence, which delayed the question of whether it tested the right thing.
- The first two field reports were logged as user error because the failure was not in the test matrix.
- Nobody owned the test plan; it had been written by a contractor who had left.
The business facts
- Timeline
- 6 months testing, 9 days to reproduce once the rig existed
- Capital raised
- $950,000
- Kestrel Power Packs
- Accra, 2023
- Packs in the field at the time
- 600
- Field failures
- 2
- Weeks withdrawn from sale
- 5
- Cost of the thermal rig
- $395
Sources